DEMO REVIEW ENVIRONMENT · OWNER FACTS PENDINGFactory-direct RFQ · Grade × Qty pricing · Demo reply target within 24h

From RFQ to Container in 6 Steps

Lead-Time Engineered

From RFQ to container
in six steps.

Every day a sofa program idles is margin you don’t earn. We engineered the full sourcing path — quote, sample, approval, production, inspection, loading — so you know the date of every milestone before you place the order.

Start my timeline → 24h quote · 7–15 days sample · 25–35 days production
24hQuote reply SLA
60–75 dRFQ to loaded container
150Sets per 40HQ
6Milestones, dated
The Timeline

Six milestones. Every date promised in writing.

No vague “4–6 weeks.” You get a dated plan, updated weekly with photo evidence from the floor.

  • Day 1start
    Quote

    RFQ → graded quotation in 24h

    SKU, Grade A/B/C pricing tiers, MOQ, CBM and lead time on one sheet. No hidden line items.

  • Day 2–14sample
    Sample

    Sample built & shipped (7–15 days)

    Built on the production line with real frame and fill, plus measurement records and detail photos.

  • Day 15–21approval
    Seal

    Buyer approval & sample sealed

    You approve against the checklist. The sample becomes the QC reference for the entire run.

  • Day 22–56production
    Build

    Production 25–35 days

    Materials locked from the spec sheet; weekly photo updates from cutting to upholstery.

  • Day 57–60inspection
    QC

    Inspection against sealed sample

    Six checkpoints on the line, final pre-shipment inspection, ISTA-tested packaging.

  • Day 60+shipping
    Load

    Container loading & documentation

    Flat-packed for lowest CBM — up to 150 sets per 40HQ — with full export paperwork.

150 setsPer 40HQ, compressed
More sofas per container
24hResponse on every RFQ
0Days of silence, ever
Do the Math

What a 4-week delay really costs a 100-set program

A conservative estimate — retail buyer, 100 sets at US$189 average wholesale. The delay is rarely the price; the price is the delay.

Cost lineWhat it coversPer week of delay
Lost sales margin100 sets sitting in your showroom plan, not your showroomUS$1,890
Freight rebookingContainer slot changes and storage at the portUS$300–600
Working capitalDeposit held while product doesn’t sellUS$150–300
Team timeChasing status, re-planning promos and displaysUS$400–800
Total cost of every delayed week≈ US$2,700–3,600
Engineered, Not Hoped

Serial sourcing vs. parallel sourcing

Most factories run steps one after another. We overlap the ones that can run in parallel — that’s where the 30–40 days come back.

Typical serial sourcing

  • Quote → wait for approval (3–7 days idle)
  • Sample → wait for courier (5–10 days idle)
  • Sample approval → then start materials
  • Production → then plan packaging
  • Packaging plan → then book container
  • Typical total: 90–120 days

YILISTAR parallel sourcing

  • Quote with options — no round-trip needed
  • Fabric and foam ordered at sample approval
  • Materials cut while courier delivers the sample
  • Packaging and CBM planned in the RFQ
  • Container slot reserved in parallel
  • Typical total: 60–75 days
You’re Never in the Dark

The weekly update cadence

From PO to loading, every Friday you get the same report — no chasing, no guessing.

Week 1

Materials in

Fabric, foam and lumber confirmed against the spec sheet with batch photos.

Week 2

Cutting & sewing

Fabric cut and sewn; seam tension samples photographed.

Week 3

Upholstery

Units being upholstered on the line; progress photos from the floor.

Week 4–5

QC & loading

Six checkpoints done, pre-shipment report, container date confirmed.

Compressed sofa packaging
Freight Advantage

Compression cuts CBM — and your freight bill

A standard 3-seater ships vacuum-compressed flat. Your container economics improve immediately:

  • 0.45 CBM per compressed 3-seater — down from ~2.5 CBM
  • Up to 150 sets per 40HQ container
  • Lower landed cost per set on every destination lane
  • Recovery & inspection protocol verified before shipment
  • Same cushion recovery standard as conventional delivery

Milestone accountability

Every dated milestone is issued in writing before the PO. If we miss a committed date, you get a recovery plan with a new date and a compensation option — discount, priority slot or split-air shipment on the overdue portion. You are never left waiting on silence.

Written milestones Weekly photos Recovery plan
Frequently Asked

Timeline questions buyers ask us

Can production start before sample approval?
Only for the materials with confirmed specs — fabric, foam and frame components. Cutting and assembly start only after you seal the sample. We overlap what’s safe and lock what isn’t.
What if I need it faster than 60 days?
Tell us your target date in the RFQ. Depending on fabric stock and production slot, we can compress the window — and we’ll show the cost of compression before you commit.
What happens if a milestone slips?
You get a recovery plan with a new date and a compensation option within 48 hours. No silence, no excuses — a plan.
Do you reserve container space in advance?
For confirmed programs, yes — container slots and loading dates are coordinated with the forwarder during production, not after.
Can I visit the factory during production?
Yes — or send an inspector. Our showroom and floor are open to buyers and third-party inspectors; we’ll arrange the visit around the production schedule.
What Happens Next

Your dated timeline starts with one RFQ

01

Send SKUs & quantities

Destination and target date included — the more context, the tighter the plan.

02

Get quote + dated timeline

Within 24h: graded pricing, CBM, and every milestone date in writing.

03

Approve and watch it run

PO placed, materials ordered, weekly photo updates begin.

Know your dates before you commit

Send SKUs, quantities and destination. We’ll return a dated timeline and grade-based quote within 24 hours.

Get my dated timeline →
RFQ reply within 24h · FOB Foshan reference · Sample 7–15 days